Rail Bhavan · 02 July 2026
National Situation Awareness
Live view of India's rolling stock health, safety and operations across all 17 Zonal Railways.
Trains Running+0.4%
13,412
Passenger Trains+0.2%
8,204
Freight Trains-0.1%
5,208
Vande Bharat Sets+2
102
Coaches
84,320
Wagons
3.24 M
Locomotives
14,880
Network Availability+0.1
99.42%
National Safety Index+0.4
98.42
AI Risk ScoreL-12
LOW
National GIS Situation Awareness
All 17 zones · live incident feed
Critical Major Info
Current focus
All 17 Zonal Railways · Live
Executive AI Copilot
Thermal anomalies on the Eastern Corridor have risen 12% today. Recommend an immediate secondary inspection on rake BTPN-2289 at Asansol Yard and rerouting 22436 to Ratlam bay for smoke sensor verification.
Fleet Risk Probability (24 h)
AI model v4.2 · updated 30 s ago
Peak forecast
18:00 IST
Model conf.
92.4%
00:0006:0012:0018:00Now
Critical Alert Wall
Prioritised by AI severity model
- 14:04:22FIREAL-92831Smoke Sensor 4B tripped — Coach C-422436 · Vande Bharat NDLS-INDBRatlam Jn, Western Rly
- 13:58:11AXLEAL-92830HABD Warning — Axle W3 at 142°C (Δ +48°C)12841 · Coromandel ExpressKharagpur, South Eastern Rly
- 13:42:03LOCOAL-92828Traction Motor #3 airflow restricted — RUL 48hWAP-7 · 37042Bhusaval Depot, Central Rly
- 13:30:41INFRAAL-92826Bridge #217 vibration signature drift—Konkan Rly Sector 4
- 13:12:00WEATHERAL-92823Dense fog forecast 04:00 — 09:00 IST—Northern Rly, NDLS Division
- 12:58:04AXLEAL-92820Wagon hunting detected at 78 kmphRake BTPN-2289Asansol Yard, Eastern Rly
Zonal Railway Performance
Punctuality · incidents · health score
| Zone | Punct. | Inc. | Health |
|---|---|---|---|
| Northern | 92.4% | 3 | 96 |
| Western | 89.1% | 5 | 91 |
| Central | 87.6% | 4 | 90 |
| Southern | 94.2% | 1 | 97 |
| Eastern | 88.3% | 6 | 89 |
| South Central | 91.0% | 2 | 93 |
| South Eastern | 86.4% | 7 | 88 |
| East Coast | 90.7% | 3 | 92 |
Workshop Productivity
POH / IOH compliance %
- Golden Rock94%
- Perambur (ICF)82%
- Kanchrapara98%
- Lallaguda91%
- Kapurthala (RCF)88%
- Modern Coach, Raebareli79%
MTBF (Loco Fleet)
4,280 hrs
+3.2%MTTR
2.4 h
-0.3 hFreight loaded today
4.82 MT
+2.1%Regen energy recovered
18.4 GWh
+5.4%